Skip to content

Services Resources

Will a Partial Valve Stroke Testing lead to a higher SIL? This question has been discussed by our very own Hassan El-Sayed (Team Lead, Functional Safety) at the HazardEx 2016 conference.

A guidance document explaining the basic requirements of compliance to ATEX Directive 2014/34/EU.

The key components that make up an ATEX Technical File, and the process for storing it.

Outlining the process and requirements for compliance of mechanical equipment under Directive 2014/34/EU

The main certification and test requirements for protection method Ex p - Purge and Pressurised

The main certification and test requirements for protection method Ex ia - Intrinsic Safety

The main certification and test requirements for protection method Ex e - Increased Safety

The main certification and test requirements for protection method Ex d - Flameproof

The main certification requirements for Ex electrostatic spraying equipment

What to do when the standards your ATEX product is certified against change

Contact an Expert

Get in Touch

Find out more about what CSA Group can do for you, or request a quote.

Request a Quote Contact Us